Home > Company News > Use and maintanence of screw conveyor
Company News
b. The feeder after installation should be left with a clearance of 20mm, the horizontal direction should be horizontal, and the suspension device should be flexible.
c. Before the air test, all the bolts should be firmed once, especially the anchor bolts with vibration and electromagnetic. After continuous operation for 3-5 hours, they should be tightened again.
d. During the test run, the two vibration motors must rotate.
e. During the feeding process, the amplitude, current and noise stability should be checked frequently, and if abnormal, it should be stopped in time.
f. Lubricating oil is added to the electromagnetic bearings every 2 months, and lubricating oil should be added once a month in high temperature seasons.
- Hand wheel operated PTFE Lined Diaphragm Valve
- BS Standard Manual PTFE Lined Diaphragm Valve
- Worm Gear Operated Stainless Steel Ceramic Lined Ball Valve
- Charging Dome Valve For Fly Ash Handing System
- Fluorine lined lift check valve
- Bare Stem Fluorine Lined Butterfly Valve
- K87-M111B-00X BACK STOPPER AXIS
- K87-M56C1-00X YAMAHA CL 12MM feeder Screw
- K87-M23BL-000 YAMAHA CL 24MM feeder Screw
- K87-M21BB-00X YAMAHA CL 8MM 12MM feeder Screw
- K87-M11BF-00X YAMAHA CL 8MM feeder Screw
- K87-M11BB-00X SCREW Yamaha part