Home > Company News > Precautions for jaw crusher
Company News
Precautions for jaw crusher2020-06-09 08:59:46
1.The crusher can only be put into production after normal operation.
2.The materials to be shredded should be evenly added into the crusher cavity, and avoid lateral feeding or full of feeding to avoid unilateral overload or overload.
3.During normal operation, the temperature rise of the bearing should not exceed 30°C, and the maximum temperature should not exceed 70°C. When it exceeds the above temperature, it should stop immediately, find out the reason and eliminate it.
4.Before stopping, the feeding should be stopped first, and the power can only be turned off after the materials in the crushing chamber are completely discharged.
5. When crushing, if the material in the crushing chamber is blocked to stop, immediately turn off the power and stop the operation, and clean the materials in the crushing chamber before starting again.
6. After one end of the jaw plate is worn, the adjustable head is used.
7. After using the crusher for a period of time, the set bush should be loosened to damage the machine.
New Products
- BS Standard Manual PTFE Lined Diaphragm Valve
- Manual Fluorine Lined Diaphragm Valve
- Stainless Steel Type Pneumatic Ceramic Double Disc Gate Valve
- 5 Inch Class 150 Stainless Steel Pneumatic Ceramic Double Disc Gate Valve
- Anti Corrosive and Abrasive Type Pneumatic Ceramic Double Disc Gate Valve
- Charging Dome Valve For Fly Ash Handing System
- Electric ventilation butterfly valve Stainless steel louver valve pneumatic louver valve
- Hyundai motor
- mud pump
- christmas tree ,x tree drill
- drill bit 26"
- HAILUNDA 65 inch OCA TV screen vacuum laminator Smart blackboard screen pressing machine
- Konecranes Brake Disc NM38740jpmv order no.52314610
- Konecranes R&M SWF Display NO.52292512
- NUCLEON Condition Monitoring Unit HG-01
- SWF Knoecranes Condition Monitoring Unit CID-48V NO.52292509
- BRAZZOLIDYEING MACHINE(6 TUBES)
- blind ram assembly,shear ram assembly,VBR ,pipe ram assembly,shaffer ,cameron
- BOP test pump QST 140J QST 35J
- packing element GK,GX hydril type
- Diverter 29 1/2”500PSI
- East Timor liquid nitrogen tank cell storage KGSQ container for liquid nitrogen
- Cambodia liquid nitrogen container for cell storage KGSQ dewar tank for liquid nitrogen
- Brunei liquid nitrogen tanks for cell storage KGSQ cryogenic liquid nitrogen container