Installation and maintenance of Jaw crush2020-06-09 08:59:46
Installation and maintenance of Jaw crush

1. The bearing is subject to the full load of the machine, so good lubrication has a great relationship with the life of the bearing. It directly affects the transmission and operation rate of the machine. Therefore, the injected lubricant must be clean and the seal must be good.

The main oil injection point of this machine: (1) Rotating bearing (2) Roller bearing (3) All gears (4) Moving bearing, sliding plane.


2. Pay attention to whether the work of each part of the machine is normal.


3. Newly installed wheels are prone to looseness and must be checked frequently.


4. Pay attention to check the degree of wear of wearing parts, and pay attention to replace worn parts at any time.


5. The plane of the chassis where the mobile device is placed should be free of dust and other objects to prevent the movable bearing from moving on the chassis when the machine encounters materials that cannot be broken, resulting in a serious accident.


6. The temperature of the bearing oil rises, it should be stopped immediately to check the reason and eliminate it.


7. If there is impact sound when the rotating gear is running, it should be stopped and checked immediately and eliminated.